6. Post Contract Changes

1. This allows you to make changes during Bid evaluation process. 

2. You can enable the option as shown below.

3. Once enabled you can add a row with a Form linked to each row.

4. Each of these rows will then be shown as new sections in the Evaluation Report , allowing you to make changes as needed.