Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Image Removed

Image Removed Move and pan

Image Removed Zoom in and out

Image Removed Colour picker

Image Removed Freehand 

Image Removed Shapes - rectangle

Image Removed Shapes - circle

Image Removed Shapes - cloud

Image Removed Shapes - arrow

Image Removed Shapes - line

Image Removed Text

Image Added

Table of Contents

Image Added

Image Added

Pin (refer here for how to pin to plan)

Call out (will log a design issue - refer here)

Image Removed Stamp 

Image Removed HighlightImage Added

Log design issue (refer here for more information)

Image Removed Edit

Image Removed Undo

Image Removed Redo

Image Removed SaveImage Added

Compare revisions (refer here for more information)

Most of the tools are self explanatory, however for some there are links to other pages within help that will show you how to use the tool. 

Adding a Stamp to the Document

Note

Stamps are configured by the Administrator on your project.  Refer here for how.

When in the publication space or marking up during a workflow, you can add a stamp to a document.

1. Once you are on the mark up toolbar.

2. Click on the stamp icon in the toolbar Image Modified

3. Click on the stamp you want to add and drag the stamp to the desired size.

4. Click Save

Image ModifiedImage Modified

Image Removed

Image Added

Move Annotations

Annotations can now be moved by clicking on Move button on the mark up toolbar.

Once clicked all annotations become movable. You can move them to the required new position and click on Save.

Image Removed

Image Added

You can also right-click on any individual mark up / annotation and select move on the context menu that is shown. 

Only Annotations Applicable to the Current Revision are Shown by Default

By default, we now only show the annotations applicable to the revision you are reviewing. 

  • Open Design Review Issues will still be shown.

  • Added a tick box option to Show All so the user can see all annotations from previous revisions.

Display markups made during a workflow from Workflow Preview screen

In a workflow, when you click the document number from the preview screen, you will be able to see the relevant markups made on that workflow (as long as you have access to them).

Image Added


Image Added

Stamps in Downloaded view

It is important to know that when a the drawing with stamp on it is downloaded to pdf, it will not have the stamp on the downloaded file. Other mark ups will be seen apart from the stamps and pinsIn order to keep the stamp on downloaded view, click button for 'Export PDF/Publish Consolidated Revision' as shown below : 

Image Added