Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

iTWOcx provides you with iTWO cx provides the ability to change the value of your a variation even after a Claim has been made against it.

To allow for changes to the variation amount you must change the configuration of the Variation document type.

How to configure a Variation so it's value can be changed after a claim:

1. Go to Configure.

2. Document types.

3. Select the Variation document type you wish to update.

Image Modified

4. On the right-hand screen scroll to this the section just above Default Values.

5. Tick the the "Can edit the value of Variations after a Claim"

6. Image Modified