Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

In this release we have released the following features


Tenders

Reporting on Progress of submission forms and interview forms

In this release, we have added the ability to report on the completion progress of tender submission and interview forms.


A new config option in has been added in Tender settings (Package Config tab) to display submission form progress 

  • When enabled a new column is added to the package progress tab called Progres
  • This progress bar will be shown for each bidder

How is the prog bar calculated

  • It will look up all forms configured in Bid submissions and check if the Tender Interview form is enabled.
  • Progress is calculated based on the number of total user fields on all of the forms configured in Bid submissions and all of the user fields configured in the tender interview form (if enabled)
  • If a user field has been filled out it will be counted towards the progress
  • The calculation will be based on the number of forms created at the time. i.e. if a Tender Interview form has not been created  it will not be included in the Calculation
  • If no form has been created progress will be shown as NA. The denominator will always be based on what is created at that time.
  • Draft bids are excluded from this calculation
  • If there are multiple forms that are being reported on you can hover over the mouse to view individual progress of those reports

  • No labels