Copy a Control SheetÂ
To copy a control sheet click on the Copy Button located in Contract Admin Configuration.
Make a Control Sheet Reportable
Tick the box in the Is Reportable field to make your control sheet reportable.
View Linked Budget Line on Control Sheet
To view the Control Sheet based on the Linked Budget Line item, go to configure > contract admin > contractor
And change the mode as shown below