Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Control sheet configuration is found:

Create a Control Sheet 

1. Click on the Control Sheets Button.

Image Modified

2. Click the + Add New Record Button.

Image Modified

3. Type Name of the Control Sheet.

4. Select the type of control sheet from the drop down menu.

Copy a Control Sheet 

1. Click on the Control Sheets Button.

Image Modified

2. Click the Copy Button on the control sheet you wish to copy.

3. Confirm whether you want to copy

Image Modified

4. Select the type of control sheet from the drop down menu.

Make a Control Sheet Reportable

Tick the box in the Is Reportable field to make your control sheet reportable.

Allowances - Salaries & Wages

Define Allowances

  • Allowance Name
  • Region
  • Weekly Amount

When at least one allowance for Salaries or Wages is configured, you can click on the Allowance Rates button.

Image Modified

Add the allowance rates.

Default Allocations - Salaries & Wages 

To edit the default allocations click on the Settings Button.

Image Modified

To show start and finish date and default allocations place a tick in respective box.

Image Modified

Once ticked the control sheet will display:

  • A Start Date column (Month - Year selection)
  • A Finish Date column (Month - Year selection)
  • A row for default allocation % (Default 100%)

When both the start and finish dates are entered, the applicable months will be pre-allocated as per the default allocation.

Additional Form Types to Show - Contractor & Supplier

To show additional form types on the control sheet, click on the settings button of the control sheet you want to change.

Add the form types as required.

Contract Column - Contractor & Supplier 

In configuration allow this column to be turned on & off at a project level.

Invoice History Columns - Contractor & Supplier

  • Added ability to configure which columns are configurable
  • Added ability to configure the column names 

Linked Budget Line - Contractor & Supplier 

For Contractor and Supplier Control Sheets you can view the Control Sheet based on the Linked Budget Line item, go to configure > contract admin > contractor

Image Modified

And change the mode as shown below