Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The Schedule Section uses date select fields to add time and date information.  These are set by default and no additional configuration is required to this section.

Lot Specification information; and

  • ITP information which is populated directly from the ITP when splitting.

The default user fields relating to Lot information are shown below:

  • Zone;
  • WBS (Work breakdown Structure)
  • Discipline
  • Chainage From/To
  • Location details.

These options can be modified to support project workflow.  The ones shown below are select fields and will require project options added.  Where these fields are on other forms, the options will need to be added to each.

Image Removed

 

 

Test Request

...

Test Request

 STILL TO COME.

The default layout for the LOT is shown below. 

...